Ukraine successful installed starch drying machine

Country:

Ukraine

Date:

June 21, 2019

Ukraine successful installed starch drying machine

After friendly negotiation in the July of 2017 when the Ukraine customer came to visit us, we closed an order of one set potato starch drying machine. This potato starch drying machine was delivered to Ukraine in August, and finished installation in November. Please check some pictures of the potato starch drying machine finished installation as below.

Here are the photo of starch drying machine loading and unloading:

starch drying machine

starch drying machine

You could see in the pictures that this potato starch drying machine is a new frameset design, which could be directly put into container for shipping, and could save a lot of installation works in customer’s factory.

starch drying machine

starch drying machineUkraine successful installed starch drying mach

Except this potato starch drying machine, we already installed one 60T/D whole liquid glucose syrup production plant in Ukraine before.The Ukraine client is very satisfied with our potato starch drying machine,and he ordered other starch processing machines,these machines will be shippedd to Ukraine very soon.

Leave a message about Ukraine successful installed starch drying machine

  • Do you want to buy machine?
  • Yes, I want to buy machine
  • No, I want to learn more in advance.
  • What is your raw material?
  • Cassava
  • Potato
  • Sweet potato
  • Other:
  • What is the final product you want to produce?
  • Chips
  • Flour
  • Starch
  • What is the final product you want to produce?
  • Garri
  • Cassava flour
  • Cassava starch
  • Cassava chips
  • Attiekie
  • Bammy
  • Other:
  • What is your planned capacity for final product?
  • <1 ton per day
  • 1 ton per day
  • 2 tons per day
  • 3 tons per day
  • 3-10 tons per da
  • 10-20 tons per day
  • >20 tons per day
  • What is the usage of your cassava chips?
  • Food usage (like fried chips, flour)
  • Industrial usage (like animal feeds, ethanol)
  • What is your planned capacity for final product?
  • <5 ton per hour
  • 5-10 tons per hour
  • >10 tons per hour
  • What is your planned capacity for final product?
  • <500 kg per hour
  • 0.5-5 ton per hour
  • 5-10 ton per hour
  • >10 ton per hour
  • What is your planned capacity for final product?
  • <300 kg per hour
  • 300-1000 kg per hour
  • 1-5 ton per hour
  • 5-10 ton per hour
  • >10 ton per hour

Name

E-mail*

Country

Tel/Whatsapp

Inquiry